Greeneville, TNLocal Weather Alerts
There are currently no active weather alerts.
Tuesday, September 8, 2026
67.21 °f
Greeneville
  • USA Today
  • CNN News
  • Fox News
  • Weather
  • Obituaries
    • Doughty Stevens
    • Jeffers Mortuary
    • Kiser-Rose Hill
WGRV.com
  • Home
  • News
  • Sports
  • Calendar
  • Weather
    • Local Forecast
    • NWS Morristown
    • WX Radar
    • GLPS Power Outage Map
  • Links
    • Convenience Center Hours
    • Greene County
    • Greeneville
    • Mosheim
    • Tusculum
    • Obituaries
      • Doughty Stevens
      • Jeffers Mortuary
      • Kiser-Rose Hill
Listen
No Result
View All Result
  • Home
  • News
  • Sports
  • Calendar
  • Weather
    • Local Forecast
    • NWS Morristown
    • WX Radar
    • GLPS Power Outage Map
  • Links
    • Convenience Center Hours
    • Greene County
    • Greeneville
    • Mosheim
    • Tusculum
    • Obituaries
      • Doughty Stevens
      • Jeffers Mortuary
      • Kiser-Rose Hill
No Result
View All Result
WGRV.com
Home News Utilities & Public Works Greeneville Water Commission

Cost To Rebuild The Water Intake Facility Could Exceed $10 Million

by Ron P. Metcalfe
October 29, 2024
in Greeneville Water Commission, News
Share on FacebookShare on TwitterEmail

Early estimates of the replacement cost of the water intake plant destroyed in the September floods of Hurricane Helene could exceed $10 million.

Greeneville Water Superintendent Laura White told the Greeneville Water Commission board Tuesday that flood waters overtopped the intake building by eight feet and damaged the walls, but the foundation and substructure were in good shape. That should save the utility a large portion of the rebuilding costs. White said the top floor had four feet of mud inside it, as well as a round bale of hay. All of the equipment was damaged or destroyed, although Assistant Superintendent Eric Frye said that some of the equipment was being checked to see if it could be salvaged.  Frye said the building sits atop 3′ diameter beams that are driven over one hundred feet into the ground down to the bedrock.  Frye said that would be the most costly part of a new building if they were no able to rebuild at that site.

While rebuilding the structure completely may take up to a year, the Water Commission has plans in place to keep the temporary pumps working until then. Round-the-clock employees monitor the pumps to ensure they are running properly and keep check on the intake lines in the river to make sure they are properly placed to draw the maximum amount of water. They also backflush the system to clear debris and leaves during the fall, and have plans in place for the sub-freezing temperatures this winter.

The first estimates of the cost of rebuilding the plant are between $10 million and $12 million, but change depending on how much of the existing building can be used or the cost of equipment in the coming months. FEMA offers reimbursement for costs during disasters, however the process can take years for the money to be recouped. To help offset the burden of the expenses until FEMA money comes, Governor Bill Lee announced a zero interest loan program to utilities. Lee set aside $35 million, but that money will also be applied for by all counties affected by the disaster.

John McInturff, the board’s insurance representative, told them that there was no flood insurance that would cover the losses at the station.  When asked about the possibility of future insurance, McInturff said that the maximum that a policy would cover would be only $1 million, but that the cost of the premiums would eventually exceed the amount of the coverage.

Frye and White said the temporary pumps are able to keep up with the demand, but the system is keeping the reservoir and tanks at their fullest capacity in the event of any problems.   White said the utility had a contingency plan in place to deal with such a disaster of this magnitude which included having temporary pumps en route to Greeneville within 48 hours.  White said that the the utility had a contract with Xylem Water Solutions to provide temporary pumps, and had installed taps on the existing lines for emergency connections.  That enabled water to begin flowing back into the system in less than five days.

Previous Post

$25 Per Hour Being Offered For Storm Recovery Jobs

Next Post

One Flown, Another Critically Injured In Motorcycle Accident

WGRV News

Completion Date Now Unknown For Repairs To 11E Bridge Over Snapps Ferry After Months Of Work

Midway Child Located Safe, Amber Alert Cancelled

Weigel’s Returning To Greeneville

Easterly Bridge Replacement Process Gradually Progressing

Hawk Updates Greene County Republican Party On Growing Tourism Numbers

The Week Ahead – Radio Greeneville News

Car Strikes Parked Vehicle, DUI Charged

232nd TU Birthday Celebration

Load More

RSS feed: GreeneSportsZone GreeneSportsZone

  • PHOTO GALLERY: GMS vs Norris Football 9-2-26
  • TSWA Prep Football Poll – Week 3
  • PHOTO GALLERY: Tusculum vs ETSU Football 9-5-26
  • POLL – Vote For The Texas Roadhouse Player Of The Week (Aug. 30 – Sept 5)
  • PHOTO GALLERY: Greeneville vs Oak Ridge Soccer 9-4-26
  • PHOTO GALLERY: South Greene vs Johnson County Football 9-4-26
  • Former Greene Devil Dabbs Impresses In Toledo Debut
  • MIDDLE SCHOOL FOOTBALL ROUNDUP: Wednesday, September 2nd & Thursday, September 3rd
  • PHOTO GALLERY: West Greene at Chuckey-Doak Football 9-2-26
  • PHOTO GALLERY: North Greene at South Greene Volleyball 9-2-26
loader-image
Greeneville
1:51 am, September 8, 2026
56°F
clear sky
37 %
1010 mb
12 mph
Wind Gust: 23 mph
Clouds: 0%
Visibility: 10 km
Sunrise: 7:01 am
Sunset: 6:26 pm

MORE RECOMMENDED NEWS

stock photo

Burglary Reported on Nelson Street

2 years ago

Rainfall Into The Weekend Could Potentially Cause Flooding

3 years ago

The Glass Menagerie at Tusculum University

3 years ago
Greene County Courthouse Annex

GC Regional Planning Commission Consider Combination Plat For Camp Creek VFD

3 years ago

Tennessee Valley Authority With Some Energy Saving Tips

3 years ago

Hazardous Weather Outlook Locally, Winter Storm Warning For Higher Elevations

10 months ago

(423) 638-4147

Public Inspection File

EEO Report

EEO Policy

SMS Policy

Privacy Policy

WGRV.com

Since 1997, we have been your first source for on-line news for Greene County, Tennessee.

Follow us on social media:

Recent News

  • Completion Date Now Unknown For Repairs To 11E Bridge Over Snapps Ferry After Months Of Work
  • Midway Child Located Safe, Amber Alert Cancelled
  • Weigel’s Returning To Greeneville
  • About Us
  • Careers
  • Advertise
  • Contact Us

© 2026 Radio Greeneville, Inc. - Serving Greene County since 1946. WGRV News.

No Result
View All Result
  • Home
  • News
  • Sports
  • Calendar
  • Weather
    • Local Forecast
    • NWS Morristown
    • WX Radar
  • Links
    • Obituaries
      • Doughty Stevens
      • Jeffers Mortuary
      • Kiser-Rose Hill
    • Convenience Center Hours
    • Greeneville
    • Greene County
    • Mosheim
    • Tusculum
    • National
      • Fox News
      • USA Today
      • CNN

© 2026 Radio Greeneville, Inc. - Serving Greene County since 1946. WGRV News.